Factory commissioning complete and our 12 module award winning NF membrane plant is ready to be delivered to Loch Ness, where it will be reassembled in 6 weeks prior to onsite commissioning.

4a E1575968467657 768x509

The water treatment works is a 1000m3/day NF membrane plant with sodium hypochlorite and ammonium sulphate disinfection, limestone media remineralisation, MSP plumbosolvency protection and sodium hydroxide pH correction. The works also has a fully integrated state of the art PROFIBUS network and SCADA system – all of which has been developed and installed in house.

Loch Ness 768x407

The 12 modules for the treatment building have been designed, fabricated, assembled, tested and pre-commissioned in our factory.  The offsite-manufactured nature of the modular water treatment plant improves water quality and delivers certainty and savings in time, cost, resource, logistics and emissions. In addition, by completing the M&E fabrication and installation in the workshop only 15% of the total project hours are spent onsite which vastly improves H&S and quality performance.

To find out more about similar water treatment plants click on the following link – Municipal Water Treatment

Alternatively visit the contacts page to get in touch – Contacts