• Water Industry

    Transportable Treatment Unit

    Ross-shire Engineering offer a full design and build programme delivering transportable treatment units sized to meet individual client and site specific requirements.

  • Large Hydro

    Hydro energy solutions across the UK

    Over 30 years of hydro power experience, offering full range of Mechanical and electrical solutions to the Hydropower Industry.

  • Oil & Gas

    Bespoke end to end solutions

    Ross-Shire Engineering are able to provide designed, engineering, fabricated, assembled and tested solutions.

  • Industrial

    Supporting clients across a wide variety of industries

    From the industrial production facilities to work on various distillery and malting sites, our design and diagnostic capabilities are widely recognised.

  • Electrical

    Supporting clients across a wide variety of industries

    From concept to delivery Ross-Shire Engineering offer a broad range of electrical services.

Ross-Shire Engineering offers its clients a complete turn-key industrial engineering service.

With over three decades of experience we offer a full service capability from project inception and detailed 3D design, through fabrication, installation and commissioning stages, not forgetting client training and subsequent operational and maintenance support. From specialist CNC machining and one off fabrication items, major oil and gas sector fabrications, bespoke water treatment plants or multi million pounds power projects, Ross-Shire Engineering have a breadth of cross sector industry experience.

Latest News

Ross-Shire Engineering installation at Lochaline well received

Through the Scottish Water alliance with ESD, RSE Group was engaged to design, manufacture and install a 195m3 TTU on the Lochaline site.  An innovative design approach was required due to site topography and access constraints, this allowed for the incorporation of a modularised welfare unit to accommodate all of...

Thursday 20th July 2017

Blair Athol - The making of the Mash Tun Bar

Ross-Shire Engineering were proud to be involved in the dismantling and strip out of the mash tun up at Clynelish, this was a challenge as the client wanted it taken out in useable sections, RSE also arranged the blasting and priming of the cast iron panels. 

Thursday 13th July 2017